L-CSU Bore Installation/Recovery Trailer


co-designed with leading mine operators to reduce risks associated with borehole pump installation, testing and retrieval. Its versatility allows the hole pump equipment to turn around quickly. L-CSU meet or exceed mine operational compliance requirements and safety specifications.

Key features include a double capstan capable of multi-speed and independent operation to provide safe and easy installation and retrieval. The cartridge reel design allows back-to-back operation and easy storage. It eliminates 100 percent of the work under live load.

Specifications

  • flexible rising main pipe: 50mm (2 inches) to 150mm (6 inches)

  • hose reel capacity to: 200 m (656 ft)

  • cable drum capacity to: 200 m (656 ft)

  • working load: 4 tons

application

  • dehydration

features

  • the double capstan can operate independently at multiple speeds, providing safe and easy installation and retrieval

  • modular/cartridge reel design for continuous back-to-back operation, reloading, maintenance work and storage

  • these modules or cassettes can be used in our specially constructed working frames for yard maintenance or on-site loading and testing

  • eliminate 100 percent of work under live load

  • the flat roller and cable guide ensure that the flat hose and cable are evenly fed to the drum winch to prevent damage and maximize drum capacity

  • hydraulic adjustable hose and cable roll for easy

  • hydraulic hose tensioner for effective "downhole" retrieval

  • onboard generators and fuel supply help to extend and isolate operations

  • winch guide prevents hose or cable from stretching or twisting or over-tensioning

  • when the operator is detected in the work area, the motion detector safety eye is closed

  • stabilize the jack to secure the trailer and prevent tipping